Projects

STRUCTURAL. SAFETY. SYSTEMS.
ENGINEERING AT ALL LEVELS.
TEMPORARY STRUCTURES FOR CONSTRUCTION | AGF ACCESS | CORNWALL, ON

Seaway Bridge Pier Scaffolding

AJW was hired to design and inspect the installation of a 85′ high access scaffolding system for the demoltion of the piers of the Massena-Cornwall International Bridge that crosses the St. Lawrence River.

Let us help you with your next project.